Vol. 5 No. 1 (2024): Jurnal MESIL (Mesin Elektro Sipil)
Articles
-
Analisis Kelayakan Investasi Pada Bangunan Puskesmas Halong Dengan Metode Net Present Value
abstract views: 452 times
downloaded: 499 times
DOI : https://doi.org/10.53695/jm.v5i1.1039
-
Evaluasi Elemen Lanskap Pada Taman Wisata Meuraxa Banda Aceh
abstract views: 391 times
downloaded: 379 times
DOI : https://doi.org/10.53695/jm.v5i1.980
-
Dokumentasi Bangunan Bersejarah Masjid Raya Lima Kaum Kabupaten Tanah Datar
abstract views: 29 times
downloaded: 142 times
DOI : https://doi.org/10.53695/jm.v5i1.981
-
Memahami Keberadaan Street Vendors di Jalan Samudera 1 Kota Lhokseumawe
abstract views: 38 times
downloaded: 49 times
DOI : https://doi.org/10.53695/jm.v5i1.992
-
Teknik Pembuatan Peta Administrasi Pada Kota Kuala Simpang, Kabupaten Aceh Tamiang
abstract views: 409 times
downloaded: 475 times
DOI : https://doi.org/10.53695/jm.v5i1.993
-
Pola Pemanfaatan Ruang Pada Pasar Tradisional Balige
abstract views: 113 times
downloaded: 160 times
DOI : https://doi.org/10.53695/jm.v5i1.1002
-
Identifikasi Karakteristik Arsitektur Kolonial pada Fasad Bangunan Istana Karang, Istana Benua Raja dan Pendopo Bupati Aceh Tamiang
abstract views: 148 times
downloaded: 146 times
DOI : https://doi.org/10.53695/jm.v5i1.1003
-
Kajian Penerapan Konsep Arsitektur Modern Pada Gedung BPJS Kesehatan Cabang Lhokseumawe
abstract views: 151 times
downloaded: 130 times
DOI : https://doi.org/10.53695/jm.v5i1.1004
-
Identifikasi Arsitektur Kolonial Terhadap Bangunan T. Bustamam, Meuligoe Bireuen dan Rumoh Ampon Loethan
abstract views: 86 times
downloaded: 108 times
DOI : https://doi.org/10.53695/jm.v5i1.1005
-
Analisis Pengendalian Kualitas Hasil Uji Tarik Material Plat ST 37 Dengan Menggunakan Metode SPC
abstract views: 286 times
downloaded: 394 times
DOI : https://doi.org/10.53695/jm.v5i1.1044
-
Evaluasi Tebal Lapis Tambah (Overlay) dengan Metode AASHTO 1993 dengan Data FWD
abstract views: 164 times
downloaded: 135 times
DOI : https://doi.org/10.53695/jm.v5i1.1049
-
Analisis penerapan Metode Fast Track Pada Proyek Pembangunan Jembatan Aek Hulim Kabupaten Padang Lawas
abstract views: 279 times
downloaded: 133 times
DOI : https://doi.org/10.53695/jm.v5i1.1069