Vol. 5 No. 1 (2024): Jurnal MESIL (Mesin Elektro Sipil)
Articles
-
Analisis Kelayakan Investasi Pada Bangunan Puskesmas Halong Dengan Metode Net Present Value
abstract views:
562 times
downloaded:
625 times
DOI :
https://doi.org/10.53695/jm.v5i1.1039
-
Evaluasi Elemen Lanskap Pada Taman Wisata Meuraxa Banda Aceh
abstract views:
441 times
downloaded:
460 times
DOI :
https://doi.org/10.53695/jm.v5i1.980
-
Dokumentasi Bangunan Bersejarah Masjid Raya Lima Kaum Kabupaten Tanah Datar
abstract views:
48 times
downloaded:
201 times
DOI :
https://doi.org/10.53695/jm.v5i1.981
-
Memahami Keberadaan Street Vendors di Jalan Samudera 1 Kota Lhokseumawe
abstract views:
51 times
downloaded:
82 times
DOI :
https://doi.org/10.53695/jm.v5i1.992
-
Teknik Pembuatan Peta Administrasi Pada Kota Kuala Simpang, Kabupaten Aceh Tamiang
abstract views:
498 times
downloaded:
583 times
DOI :
https://doi.org/10.53695/jm.v5i1.993
-
Pola Pemanfaatan Ruang Pada Pasar Tradisional Balige
abstract views:
138 times
downloaded:
228 times
DOI :
https://doi.org/10.53695/jm.v5i1.1002
-
Identifikasi Karakteristik Arsitektur Kolonial pada Fasad Bangunan Istana Karang, Istana Benua Raja dan Pendopo Bupati Aceh Tamiang
abstract views:
196 times
downloaded:
215 times
DOI :
https://doi.org/10.53695/jm.v5i1.1003
-
Kajian Penerapan Konsep Arsitektur Modern Pada Gedung BPJS Kesehatan Cabang Lhokseumawe
abstract views:
172 times
downloaded:
167 times
DOI :
https://doi.org/10.53695/jm.v5i1.1004
-
Identifikasi Arsitektur Kolonial Terhadap Bangunan T. Bustamam, Meuligoe Bireuen dan Rumoh Ampon Loethan
abstract views:
112 times
downloaded:
173 times
DOI :
https://doi.org/10.53695/jm.v5i1.1005
-
Analisis Pengendalian Kualitas Hasil Uji Tarik Material Plat ST 37 Dengan Menggunakan Metode SPC
abstract views:
334 times
downloaded:
467 times
DOI :
https://doi.org/10.53695/jm.v5i1.1044
-
Evaluasi Tebal Lapis Tambah (Overlay) dengan Metode AASHTO 1993 dengan Data FWD
abstract views:
188 times
downloaded:
177 times
DOI :
https://doi.org/10.53695/jm.v5i1.1049
-
Analisis penerapan Metode Fast Track Pada Proyek Pembangunan Jembatan Aek Hulim Kabupaten Padang Lawas
abstract views:
345 times
downloaded:
163 times
DOI :
https://doi.org/10.53695/jm.v5i1.1069
K M B Sahureka, F A Sangadji, I Oppier, S I Latuconsina
